Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (payment to be made on the basis of measurement of finished quantity of work)(a) with earth obtained from excavation of foundation. weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joininglongitudinal ends, closing ends of sausage, carriage of wire to site of work
Sector: Municipality