Details: earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (mode of measurement: pre works and post works) (i) in ordinary soil building works (b) dismantling, cutting chase, holes etc 6. dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing as directed within a lead of 75 m. a) in ground floor including roof. building works(p) soling, edging and metalling??(15)labour for taking out old soling edging including removing debris. (a) single flat soling building works(p) soling, edging and metalling??(2)labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials bel
Sector: Municipality