Details: cleaning , sludge, weedsscum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing thesludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing thesame by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the engineerin- charge. (payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside)(ref. pwd sanitary and plumbing 2017,page-100, it.-28) labour rates per diem : 3)mazdoor (male). note: (i)the above rates of labour are exclusive of 10% contractors profit and 1% labour welfare cess which would be admissible to the contractors, but contract
Sector: Municipality