Details: takingout existing vertical and horizontal pipe line upto 300 mm dia d.f.pipe from the water tanker line and lowering the same without damaging of pipe and specials. labour charges for laying c.i.d.f. pipeline upto 300 mm in proper alignment either above ground or under ground, vertical or horizontal line as per direction of e.i.c. supplying fitting & fixing in position c.i sluice valve and n.r. valve with flanged ends drilled as per is 1358/62 and having all cast iron componment as per 780/71 solid forged bronze inside spindle nut,valve and seal faces of hardware resisting manufactured from best quality gun metal conferming to is 780/71 painted black allover with asphal base paint tested to 21kg hydraulic pressure per sq. cm valve opening to anticlockwise direction fitted and fixed complete.(a)200 mm dia s.v (b)150mm sluice valve (c)150 mm dia n.r.v. (d)100mm dia s.v supplying fitting & fixing stainless steel spin
Sector: Municipality