Details: earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (mode of measurement: pre works and post work section(b) - sanitary and drainage works.(b)-(ii) soil pipe and fittings.(a) original works.(16.)supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm section(b) - sanitary and drainage works.(b)-(ii) soil pipe and fittings.(a) original works.(16.)supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(ii) 225 mm section(b) - sanitary and drainage works.(b)-(ii) soil pipe and fittings.(a) original works.(16.)supplying,