Details: taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. resetting of stone slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) vertical kerb resetting of stone slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. building works (a) earth work,antitermite treatment 1.surface dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the within a lead upto 75 m as directed. building works ( c ) brickworks, concrete works etc. a. brick works 1. single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd corrigenda & addenda dated 04.06.2018) labour for layi
Sector: Municipality