Details: building works (g) wood and pvc works a. door window frame 1. wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, iron hinges and m.s clamps. (the quantum should be correted upto three decimals). (d) sal : local. note: extra for lifting charges for each additional floor, i) rs. 200/- per cu.m (upto 4th floor) ii) rs.250/-(above 4th floor) building works (d) flooring b. repair and rehabilitation 1. a) supplying & laying of approved brand of scratch proof, semi flexible p.v.c. blended homogeneous marble vinyle flooring in tiles conforming to is:3461, fixing with synthetic acrylic adhesive after preparing the floor, levelling & smothaning when necessary with suitable putty, as per the design & instruction of the engineer-in-charge. 2 mm thick building works (g) wood and pvc works g. wall panelling 14supplying fitting, fixing decorative lamination conforming to is:
Sector: Municipality