Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) depth of excavation not exceeding 1,500 mm. box cutting or filling in embankment in all sorts of soil including spreading the spoil properly over the flank as necessary or on berm to approximate grade &camber and rolling the sub grade as per direction and proper camber and grade as per direction and satisfaction of engineer in charge including uprooting and removing plants and jungle when and where necessary. (a)depth up to 150 mm. filling in foundation or plinth by fine sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of sup
Sector: Municipality