Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. depth of excavation not exceeding 1,500 mm filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. do - by fine sand single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. cement concrete with graded stone ballast (40 mm sizeexcluding shuttering) in ground floor (a) [pakur variety] 1:3:6 proportion brick work with 1st clas
Sector: Municipality