Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. dismantling r.c. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars.(a) in ground floor including roof "dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing as directed within a lead of 75 m."a) in ground floor including roof (b) filling in foundation or plinth by silver sand inlayers not exceeding 150 mm a
Sector: Municipality