Details: dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing as directed within a lead of 75 m. box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of engineer-in-charge including uprooting and removing plants and jungles when and where necessary.(a) depth up to 150 mm. filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)(b) do - by fine sand single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. i
Sector: Municipality