Details: picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. by manual means, from 50 mm to 100 mm thick. box cutting or filling road embankment to the depth upto 150 mmin all sorts of soil including gerading the spoils properly over the flank as necessary or on beam to approximate gradeand chamber and grade as per direction and satisfaction of engineer-in-charge including remvoving and uprooting plants and jungle when and where necessary a) for depth upto 150 mm earth work in excavation of depth not exceeding 1.5 m. of drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including remov ing, spreading or stacking the spoils within a lead of 75 m. as directed, necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (i) depth of excavation not exceeding 1.5 m
Sector: Municipality