Details: page no; 12, item no; 13, removal of ,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the municipal /corporation rules for such disposal, loading into truck and cleaning the site in all respect as per direction of engineer in charge page no- 2, item no- 4(a) filling in foundation or plinth by silver sand inlayers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. page no; 14, item no; 1, single brick flat soling of picked jhama bricks includingramming and dressing bed to proper level and filling joints with local sand. page no; 15; item no; 7(a), brick work with 1st class bricks in cement mortar (1:4)(a) in foundation and plinth page no; 16; item no; 16, 125 mm. thick brick work with 1st class bricks in cementmortar (1:4) in ground floor. page no; 189; item no; 1(ii)(b), plaster (to wall, floor, ceiling etc.) with sand and cement mortar
Sector: Municipality