Details: earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (mode of measurement: pre works and post works) (i) in ordinary soil labour for taking out old soling edging including removing debris.(a) single flat soling labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( ref :pwd (bldg.)-2017, it. no. 1, page no.14 & 3rd corrigenda addenda dtd-04.06.18,p-1) 35mm thick cement concrete pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry paste@2.75kg cement per sqm. rounding off corners, chequering as required including taking necessary protective measure complete in gr.floor/footpath. raising cover and
Sector: Municipality