Details: dismantling r.c. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars.(a) in ground floor including roof.(b) extra rate for each addl floor over the rate of ground floor dismantling r.c. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars.(a) in ground floor including roof.(b) extra rate for each addl floor over the rate of ground floor stripping off worn out plaster and raking our joints of walls, celings etc. upto any height and in any floor including removing within a lead of 75m as directed. removal of ,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the municipal / corporation rules for such disposal, loading into truck and cleaning the site in all respect as per direction of engineer in charge taking out carefully g.c.i. or c.i. or asbestos sheets (including ridges etc.) from
Sector: Agri Marketing