Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) depth of excavation not exceeding 1,500 mm. construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per clause 401 of specifications for road & bridge works of mort&h (5th revision)l (c) 60 mm thick interlocking
Sector: Agri Marketing