Details: item description/ heading dismantalling of old ,damaged plaster or skirting raking out joints and cleaning the surface for plaster including disposal of the to the dumping ground within 50 lead. demolishing cement concrete manually/ by mechanical means includingdisposal of material within 50 metres lead as per direction of engineer - in -charge. nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) dimolishing brick work manually /by machanical means including stacking of seviceable material and disposal of un serviceable material within 50 meters lead as per direction of engineer in charge.in cement morter earth work in excavation by mechanical means (hydraulicexcavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-incharge. all kinds of soil half brick masonry with common burnt clay f.p.s. (non modular) bricks ofcl
Sector: Mining