Details: labour for chipping of concrete surface before taking up plastering work. page-192, item- 1 ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant is codes. c c roadas per rate analysis hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor. (f) 25 mm to 30 mm thick wooden shuttering without staging as per decision & direction of engineer-in-charge. c c roadp - 42, it-36 ( a ), ( c ) 18% gst 1% cess
Sector: Municipality