Details: earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (payment to be made on the basis of measurement of finished quantity of work) (c) (i) with carried earth arranged by the contractor within a radius of 1 km. including cost of carried earth. filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (b) do - by fine sand. single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and col
Sector: Municipality