Details: earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (mode of measurement: pre works and post works) (ii) in mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) (ref : pwd (rds & brdgs)-2018 it. no. 3.04 page no.237 supplying, spreading and compacting sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. note:- add cost at site of the materials to arrive at the complete rate. the compaction factor for dry, clean sand may be taken as 0.835. (the payment is to be made on the basis of finished compacted volume).(a) for fine sand ( ref :pwd (rds & brdgs)-2018, it
Sector: Municipality