Details: picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. (a) by manual means : (i) from 25 mm to 50 mm thick. ( ref :pwd (rds & brdgs)-2018, it. no. 18.02 page no.331) earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (mode of measurement: pre works and post works) (ii) in mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) (ref : pwd (rds & brdgs)-2018 it. no. 3.04 page no.237 wet mix macadam base course providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including screening of aggregates and granular materials, premixing the material with water at omc in wet mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and com
Sector: Municipality