Details: labour for taking out brick- on -end edging including removing debries to flank or berm, sorting out serviceable materials & stacking labour for taking out brick-on-edge of herring bond including removing debris to flank or berm sorting out serviceable materials and stacking. labour for taking out old soling edging including removing debris (a)single brick flat soaling labour for breaking 1/2 bricks or full bricks (old/ new) into metal / khoa / chips as per specific size and stacking the same at site or stackyard with due allowance of sinkage / shrinkage as per direction of the engineer in charge.(b) khoa size 32 mm to 25 mm construction of sub base on prepared surface using local materials after mixing by mix in place method at omc with suitable mixing equipments and spreading in uniform layers with spreading equipments capable of mixing the materials to the desired degree and spreading the mix materials uniformly acording to required line and level including screening the
Sector: Social Development