Details: box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of engineer-in-charge including uprooting and removing plants and jungles when and where necessary.(a) depth up to 150 mm. ( ref :pwd (rds & brdgs)-2018, it. no. 3.16 page no.240) cement concrete with graded jhama khoa (30 mm size) excluding shuttering in ground floor and foundation.(a) 1:3:6 proportion ( ref :pwd (bldg.)-2017, it. no. 1, page no.23 & 3rd corrigenda addenda dtd-04.06.18, p-9 & 10) supplying and laying factory made vertical kerb stone of cement concrete m-20 (1:1.5:3) machanicaly vibrated size 500mm x 350mm x 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( ref :rate based on pwd
Sector: Municipality