Details: picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. (a) by manual means : (iii) above 100 mm thick. ( ref :pwd (rds & brdgs)-2018, it. no. 18.02 page no.331) chapter - viii supplying of materials hire charges of machineries 8.29hire charges for engaging air compressor machine with minimum pressure capacity of 5.0 kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, tools and plants all complete for cutting road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of eic . a) with pneumatic hammers for minimum engagement of 8 hrs. in a day earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (mode of measurement: pre works and post works hire and labour charges for shuttering with or
Sector: Municipality