Details: labour for taking out brick on end (25 cm.) edging including removing debries to flank or berm, sorting of serviceable materials & stacking within a lead of 30 metre labour for taking out old soling including removing debriesb) double brick flat soling labour for laying brick edging(75 mm wide) with old or new departmental bricks laid true to line and level including carriage of bricks within a lead of 150 metres cutting necessary trench in soil laying the bricks and repacking the trench on both sides and ramming complete.b) on end edging(250mm)depth box cutting in road embankment in all kinds of soil and spreading the soil uniformely over the flanks and considerating and dressing the subgrade to correct camber and grade. brick edging(75 mm wide) with 1st class picked jhama bricks laid true to line and level including cutting necessary trench in soil or hard metal surface laying the bricks and repacking the trench on both sides and ramming complete. brick-on-end edging (250 mm) dept
Sector: Social Development