Details: chapter - i [ supplementary ] excavation, shoring, bamboo piling, fencing & sign board, lighting & signaling and site cleaning etc. 1.12 supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theengineer-in-charge. payment of concrete and painting to be made separately. (i) 600 mm. x 450 mm. size of board. chapter - viii supplying of materials 8.25 carriage of ci / dl / erwms / ac pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (including carriage by head load upto 30 metres at each of the two points. the rate covers all the a
Sector: Municipality