Details: earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilizing the remaining earth locally for road work (reference to mort&h's specification clause 304).ordinary soil, manual means (depth upto 3 m) excavation in soil using hydraulic excavator ck 90 and tippers with disposal upto 1000 metres.excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (reference to mort&h's specification clause 301). excavation in hard rock (blasting prohibited)excavation for roadway in hard rock (blasting prohibited) with
Sector: Road development