Details: chapter - i [ supplementary ] excavation, shoring, bamboo piling, fencing & sign board, lighting & signaling and site cleaning etc. 1.1 earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. chapter - i [ supplementary ] excavation, shoring, bamboo piling, fencing & sign board, lighting & signaling and site cleaning etc. 1.5 cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the engineer-in- charge. chapter - i
Sector: Municipality