Description: Up gradation of DTC Mayapuri Depot for Electric buses Name of Work Up gradation of DTC Mayapuri Depot for Electric buses
Details: Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Excavating trenches of required width for pipes, cables, etc includingexcavation for sockets, and dressing of sides, ramming of bottoms,depth upto 1.5 m, including getting out the excavated soil, and thenreturning the soil as required, in layers not exceeding 20 cm in depth,including consolidating each deposited layer by ramming, watering,etc. a
Sector: Transport Dept