Details: dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. (a) nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) dismantling & taking out old rcc pipes from excavated trenches with the help of chain pulley block/labour including breaking of joints, cleaning of pipes silt & stacking of serviceable material & disposal of unserviceable material within a lead of 50 meter lead. a) 150 mm to 300 mm dia rcc pipe earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as dire
Sector: Municipality