Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-iii): 10 graded stone aggregate 40 mm nominal size). brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in: cement mortar 1:6 (1 cement : 6 coarse sand) 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) providing and laying damp-proof course 40 mm thick with cement concrete 1 :2:4 (1 cement : 2 coarse sand (zone-ill) derived from natural sources : 4 graded stone aggregate 12.5 mm nominal size derived from natural sources) kota stone sla
Sector: Municipality