Description: Repairing of table top and footpath repair at Tilak Lane area under Subdivision III R I Name of Work Repair and Maintenance of Infrastructure Assets in R I Division during 2024 25 SH Repairing of table top and footpath repair at Tilak Lane area under Sub division III R I
Details: Earth work in surface excavation not exceeding 15 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level: 1:5:10 (1 Cement : 5 Manufactured Sand derived from Recycled concrete aggregate (RCA) : 10 graded stone aggregate 20 mm nominal size Recycled aggregate (RA)) Providing and laying DQ stone flooring of size 100x100 mm and 80-100 mm thick laid on 20 mm (average) thick base of cement mortar 1:6 (1 cement : 6 coarse sand) laid finishing joints with 10 mm thick and pointing with cement mortar 1:3 (1 cement : 3 coarse sand) an admixture of pigment to match the shade of stone complete as per instructions and pattern approved by Engineer-in-charge. Providing and laying 60mm thick factory made cement
Sector: Municipality