Details: demolishing cement concrete manually/ by mechanical meansincluding disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) excavating holes more than 0.10 & upto 0.5 including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. all kinds of soil taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in-charge. structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixin
Sector: Agri Marketing