Details: dismantling stone slab flooring/cc slab laid in cement mortar including stacking of serviceable material anddisposal of unserviceable material within 50 metres lead. taking out existing cc interlocking paver blocks from footpath/ centralverge, including removal of rubbishetc., disposal of unserviceablematerial to the dumping ground, for which payment shall be madeseparatelyand stacking of serviceable material within 50 metre leadas per direction of engineer-in-charge. demolishing cement concrete manually/ by mechanical means including disposal of materialwithin 50 metres lead as per direction of engineer - in - charge.nominal concrete 1:4:8 or leaner mix (i/cequivalent design mix) earth work in surface excavation not exceeding 15 cm in depth but exceeding 1.5 m in width as well as 10sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, asdirected by engineer-in- charge: all kinds of soil providing and laying in position cement concrete of spec
Sector: Municipality