Details: running, operation and maintenance of fountains of sanjay lake park i/c running the fountains in two shifts (morning & evening) inluding providing/repairing of mortors and replacing damaged electrical parts like mcb, volt metre wire, replacement of fountain nozzles, gate valve, nrv, led lights etc. and other mechanical/electrical parts as required for smooth functioning of fountains at sanjay lake (complete job) or as per satisfaction and direction of engineer in charge. (for two nos. of fountains at sanjay jheel @ each in two shift, the shift will be 8 hours). conditions:-1. the timing of the operation of the fountain may vary in each shift or season by season as specified by engineer-in-charge.2. any fountain will be non-operational for a maximum period of 48 hours, once a month, or as per requirement for cleaning purposes as per roaster.3. electricity will be supplied free of cost by the deptt. at each below list
Sector: Municipality