Details: cutting bituminous premix road surface excluding water bound macadam and disposal of dismantled material within 50 m. lead. cutting water bound macadam roads including screening sorting and stacking of serviceable and disposal of unserviceable material within 50m lead. earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:4:8 (1 cement : 4 manufactured sand driverd from recycled concrete aggregate (rca) : 8 graded stone aggregate 40 mm nominal size recycled aggregate (ra) brick work with common burnt clay f.p.s. (non modular) bricks
Sector: Municipality