Details: dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge :bituminous road. dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge :water bound macadam road demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer -in - charge nominal concrete 1:3:6 or richer mix (including equivalent design mix) earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift,as directed by engineer-in-charge. all kinds of soil earth work in excavation by mechanical means (hydraulic excav
Sector: Municipality