Details: taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in-charge demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge.nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out
Sector: Agri Marketing