Details: removing, dismantling of compressor (200 amps) from chilling base frame to floor of trace with the help of chain pulley and heavy labour and transporting to work shop to rewind the stator i/c refixing the same compressor bringing back to terrace at 7th floor of base frame with fixing of allied refrigerant pipe line, controller etc. as required in supervision of site staff. rewinding the stator of compressor dismantling the entire hardwires of unit with copper wire of existing sizes assembling the same in position as required. charge of r-134 refrigerant after evacuating/vacuuming the circuit. (partly)
Sector: Telecommunication