Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of outside the periphery of the area cleared. excavation :- earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas including getting out and disposal of excavated earth as directed by engineer-in-charge. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering as directed by engineer-in-charge. supplying and filling of local earth (including royalty) by mechanical transport also including ramming and watering of the earth in layers not exceeding 20cm in trenches, plinth, sides of foundation etc. complete. pcc (1:3:6, upto plinth level) :- providing and laying in position cement concrete of specified grade excluding the cost of centerin
Sector: Generation