Details: supplying and dumping 500 kg to 2500kg size blasted granite stones of gravity not less than 2.65 for strengthening the sea wall protection work at strengthening of damaged sea wall protection work at westerns side from south end of canteen building towards south ( balance portion) and west side of monazite plant area including supply of stone, loading from quarry to tipper by crane, conveying to site , weighing on company weight bridge at chavara for measurements, unloading ,dumping and packing in position at site to lines and levels, for strengthening the sea wall at required section with crane/hitachi including cost & conveyance of material, all labour charges, hire and operational charges of tools and plants , wages of all operations, forming kutcha road if required , all lead and lift ,all other incidental expenses etc complete as directed by the officials in charges
Sector: Mining