Details: road & drain providing and constructing 75 mm. thick modified penetraction macadam (mpm) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% hand broken metal (by breaking rubble obtained by blasting) , heating and spraying the bitumen of vg-30 grade @ 2 kg / sqm , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 mt. to achive the desired degree of compaction as per technical specification clause 506 etc.complete, including applying tack coat of vg 10 grade bitumen at the rate of 0.30 kg sqm. on existing bitumen surface. and seal coat ( for repair works only)add. spec: as directed by engineer in chargessr 2022-23 sr.no.374 it.no.08.34 charges for testing of material in vigilance & quality control laboratory for bitumen , softening point, flash & fire point, specific rate as per ssr 2022-23 page no.427
Sector: Municipality