Details: construction of samajik sabhagrah in nhavi galli, vaijapur for municipal council vaijapur excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with crushed sand/grit, ramming, watering etc. complete. providing and laying cast in situ/ready mix cement concrete in m-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with
Sector: Municipality