Details: capex cost 18 m electric articulated buses - (24 +1) rolling stock, with flash charging flash / opportunity chargers at selected route charging locations including downstream infra and installation depot chargers including the downstream infra and installation depot construction and infrastructure - control room and civil works new fab bus shelters with solar, toilets & kiosks msedcl upstream charging infrastructure at flash charging locations opex cost (base rate per km) manpower rate/km electricity rate/km full maintenance rate/km finance rate/km misc. rate/km
Sector: Municipality