Details: laying and jointing pvc pipe. heading dewatering on bhp basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 3.0 bhp pump etc. complete. (prior approval of superintending engineer will be necessary) removing rich mix cement concrete including stacking the apoil as directed with att leads lift etc complete dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. excavation for foundation in hard murum including removing theexcavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including
Sector: Municipality