Details: Construction of Charkop Sec 2 DSS CONSTRUCT, PILE, F/TESTING Mobilisation of all plants, equipments, personnel for true and faithful performance of the contract, Setting out and survey (with Thedolite and cad drawing for same shall be submit for checking of EIC.) work and demobilizing the same after completion.number of Machines Requred at site will be decided by EIC (Payment against this item will be released only after demobilization) use of Rotary Machines for 90% piles. Where ever not possible use conventional tripod method. Cost shall be consiered for both mobilisation.BORE, PILE, 700 MM CAST IN SITU BORED PILES-700MM DIA Boring 700mm dia piles in all types of soil & murum & installing cast-in-situ RCC vertical bored piles of 700mm diameter and of specified length for working piles and test piles as per the owners design.drawings, specifications including cost of labour with associated plants,tools & tacles etc. all complete as per the direction of engg. in charge. The fol
Sector: Power Sector