Details: rehabilitation of rcc members such as columns, beams etc. in multistoryed building upto a height of 30 meter above ground level with cement concrete as per the following operation and directed by the engineer in charge. a) providing erecting dismantling two lagged steel tubular/wooden ballies of saffolding with suitable schorages screensete for the work upto a height 30m, and removal of the same after completion of work.complete as per direction and approval of engineer-in- charge. the elevational area of the scaffolding shall be measured for payment purpose. the payment will be made once irrespective of duration of scaffolding. ( to be used for maintenance work judically) b) reliving structural members such as beems, columns, slabs of their superimposed loadas partially or fully as directed by provision of adjustable steel props frames etc. including providing necessary timber runners planks bracings jacking up arrangement including tubular steel scaffolding upto any height etc. co
Sector: Telecommunication