Details: item no. 1 excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc comp. lift 0 to 1.50 m mjp/ssr/2023-24/page no.37 i.no.1 item no. 2 excavation for foundation / pipe trenches in hard murum and boulders, w.b.m. road including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc comp. lift 0 to 1.50 m mjp/ssr/2023-24/page no.37 i.no.3
Sector: Municipality