Details: excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. by mechanical means. conveying materials obtained from road cutting including all lifts, laying in layers of 20cm. to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard proctor density for a lead of 300m. to 500m. inclusive, from the site of excavation to the site of deposition as directed. raising the existing manhole chamber with 23 cm thick brick work in cm 1 : 5 prop. in 30 cm concentrick cone including 12 mm thick cement plaster in cm 1 : 4 prop on both side complete.(as per rate analysis) construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed mate
Sector: Municipality