Details: removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff asdirected all sorts of soils. removing np-2 and np-3 class pipes including stacking at road side as directed by the engineer in charge. upto 900mm dia and above. etc complete. providing and laying concrete pipes of i.s.np. class of 300mm diameter in proper line, level and including necessary collars, excavation, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete. providing soling using 80 mm size granite / quartzite / gneiss / trap metal in 15 cm. layer including hand packing filling voids with sand / grit, ramming, watering complete. (spec. no. : as directed by engineer-in-charge /page no. 154) providing and laying cast in situ/ready mix c
Sector: Municipality